The study examined whether shutting down a larger power plant auch as the nuclear power plant Grafenrheinfeld could lead to bottlenecks in security of supply. It was considered possible in advance that the amounts of electricity needed to cover the energy needs in the annual balance sheet or at the time of maximum electricity consumption (annual peak load) could be missing.

Arepo prepared the analysis and made recommendations regarding the shutdown of the Grafenrheinfeld nuclear power plant.