{"id":7663,"date":"2024-03-19T12:10:28","date_gmt":"2024-03-19T12:10:28","guid":{"rendered":"https:\/\/arepoconsult.com\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/"},"modified":"2025-08-20T12:11:20","modified_gmt":"2025-08-20T12:11:20","slug":"zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien","status":"publish","type":"arepo_prjct","link":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/","title":{"rendered":"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">Project background<\/h3>\n\n\n\n<p>Arepo was commissioned by the Deutsche Gesellschaft f\u00fcr Internationale Zusammenarbeit (GIZ) with the central project evaluation of the project <em>&#8220;IGEN Energy transition with distribution companies (DISCOMs), India,&#8221;<\/em> which was a project under the umbrella of the Indo-German Energy Programme implemented on behalf of the Federal Ministry of Economic Cooperation and Development (BMZ). In cooperation with the Ministry of Power (MoP), the TC module aimed to strengthen selected DISCOMs in data analysis, data processing, and operation and maintenance of distribution grids through the implementation of pilots and capacity building. Successful pilot measures were scaled nationwide, and results were used to improve the legal framework conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tasks<\/h3>\n\n\n\n<p>Arepo evaluated the project and carried out a detailed analysis of all six OECD-DAC criteria. In addition, during the inception phase, stakeholders relevant to the project were asked about their specific knowledge interests for the evaluation, and these questions were then addressed as part of the evaluation. This ensured that the evaluation had the greatest possible benefit for the target group. A significant part of the evaluation was linked to on-site research.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project background Arepo was commissioned by the Deutsche Gesellschaft f\u00fcr Internationale Zusammenarbeit (GIZ) with the central project evaluation of the project &#8220;IGEN Energy transition with &#8230;<\/p>\n<p><a class=\"readmore-execrpts arepo-read-more-link\" href=\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\">Read more <i class=\"fa fa-arrow-circle-right\"><\/i><\/a><\/p>\n","protected":false},"featured_media":7660,"menu_order":55,"template":"","arepo_magic_moment":[],"arepo_method":[16],"arepo_region":[68],"arepo_target_group":[],"arepo_topic":[49,14],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.13 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult\" \/>\n<meta property=\"og:description\" content=\"Project background Arepo was commissioned by the Deutsche Gesellschaft f\u00fcr Internationale Zusammenarbeit (GIZ) with the central project evaluation of the project &#8220;IGEN Energy transition with ...Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\" \/>\n<meta property=\"og:site_name\" content=\"Arepo Consult\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-20T12:11:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2121\" \/>\n\t<meta property=\"og:image:height\" content=\"1414\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\",\"url\":\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\",\"name\":\"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult\",\"isPartOf\":{\"@id\":\"https:\/\/arepoconsult.com\/#website\"},\"datePublished\":\"2024-03-19T12:10:28+00:00\",\"dateModified\":\"2025-08-20T12:11:20+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/#breadcrumb\"},\"inLanguage\":\"en\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Energy Systems\",\"item\":\"https:\/\/arepoconsult.com\/en\/topics\/energy-systems\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/arepoconsult.com\/#website\",\"url\":\"https:\/\/arepoconsult.com\/\",\"name\":\"Arepo Consult\",\"description\":\"All on Renewable energy and energy Efficiency POlicy\",\"publisher\":{\"@id\":\"https:\/\/arepoconsult.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/arepoconsult.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/arepoconsult.com\/#organization\",\"name\":\"Arepo Consult\",\"url\":\"https:\/\/arepoconsult.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en\",\"@id\":\"https:\/\/arepoconsult.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/arepoconsult.com\/wp-content\/uploads\/2019\/07\/arepo-logo.svg\",\"contentUrl\":\"https:\/\/arepoconsult.com\/wp-content\/uploads\/2019\/07\/arepo-logo.svg\",\"width\":476,\"height\":197,\"caption\":\"Arepo Consult\"},\"image\":{\"@id\":\"https:\/\/arepoconsult.com\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/","og_locale":"en_US","og_type":"article","og_title":"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult","og_description":"Project background Arepo was commissioned by the Deutsche Gesellschaft f\u00fcr Internationale Zusammenarbeit (GIZ) with the central project evaluation of the project &#8220;IGEN Energy transition with ...Read more","og_url":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/","og_site_name":"Arepo Consult","article_modified_time":"2025-08-20T12:11:20+00:00","og_image":[{"width":2121,"height":1414,"url":"https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/","url":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/","name":"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India - Arepo Consult","isPartOf":{"@id":"https:\/\/arepoconsult.com\/#website"},"datePublished":"2024-03-19T12:10:28+00:00","dateModified":"2025-08-20T12:11:20+00:00","breadcrumb":{"@id":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/#breadcrumb"},"inLanguage":"en","potentialAction":[{"@type":"ReadAction","target":["https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/arepoconsult.com\/en\/projects\/zentrale-projektevaluierung-igen-energiewende-mit-verteilerunternehmen-discoms-indien\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Energy Systems","item":"https:\/\/arepoconsult.com\/en\/topics\/energy-systems\/"},{"@type":"ListItem","position":2,"name":"Central Project Evaluation of the project IGEN Energy transition with distribution companies (DISCOMs), India"}]},{"@type":"WebSite","@id":"https:\/\/arepoconsult.com\/#website","url":"https:\/\/arepoconsult.com\/","name":"Arepo Consult","description":"All on Renewable energy and energy Efficiency POlicy","publisher":{"@id":"https:\/\/arepoconsult.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/arepoconsult.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en"},{"@type":"Organization","@id":"https:\/\/arepoconsult.com\/#organization","name":"Arepo Consult","url":"https:\/\/arepoconsult.com\/","logo":{"@type":"ImageObject","inLanguage":"en","@id":"https:\/\/arepoconsult.com\/#\/schema\/logo\/image\/","url":"https:\/\/arepoconsult.com\/wp-content\/uploads\/2019\/07\/arepo-logo.svg","contentUrl":"https:\/\/arepoconsult.com\/wp-content\/uploads\/2019\/07\/arepo-logo.svg","width":476,"height":197,"caption":"Arepo Consult"},"image":{"@id":"https:\/\/arepoconsult.com\/#\/schema\/logo\/image\/"}}]}},"arepo_prjct_date_start":"2024-01-15T12:08:11","arepo_prjct_date_end":"2024-11-15T12:08:26","arepo_featured":{"sizes":[{"width":2121,"attr":"(max-width: 2121px) 100vw, 2121px"},{"width":300,"attr":"(max-width: 300px) 100vw, 300px"},{"width":1024,"attr":"(max-width: 1024px) 100vw, 1024px"},{"width":150,"attr":"(max-width: 150px) 100vw, 150px"},{"width":768,"attr":"(max-width: 768px) 100vw, 768px"},{"width":1536,"attr":"(max-width: 1536px) 100vw, 1536px"},{"width":2048,"attr":"(max-width: 2048px) 100vw, 2048px"},{"width":60,"attr":"(max-width: 60px) 100vw, 60px"}],"srcSet":"https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation.jpg 2121w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-300x200.jpg 300w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-1024x683.jpg 1024w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-150x150.jpg 150w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-768x512.jpg 768w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-1536x1024.jpg 1536w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-2048x1365.jpg 2048w, https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-60x60.jpg 60w","src":"https:\/\/arepoconsult.com\/wp-content\/uploads\/2024\/03\/solar-panel-installation-300x200.jpg","height":1414,"width":2121},"arepo_method_primary":false,"arepo_region_primary":false,"arepo_target_group_primary":false,"arepo_topic_primary":false,"arepo_client":[1262],"arepo_prjct_partner":[],"arepo_title_short":"","arepo_wpml_original":{"language_code":"de","element_id":7657,"thumbnail_id":7659,"thumbnail_translations":{"en":7660,"de":7659}},"_links":{"self":[{"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_prjcts\/7663"}],"collection":[{"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_prjcts"}],"about":[{"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/types\/arepo_prjct"}],"version-history":[{"count":3,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_prjcts\/7663\/revisions"}],"predecessor-version":[{"id":8496,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_prjcts\/7663\/revisions\/8496"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/media\/7660"}],"wp:attachment":[{"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/media?parent=7663"}],"wp:term":[{"taxonomy":"arepo_magic_moment","embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_magic_moment?post=7663"},{"taxonomy":"arepo_method","embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_method?post=7663"},{"taxonomy":"arepo_region","embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_region?post=7663"},{"taxonomy":"arepo_target_group","embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_target_group?post=7663"},{"taxonomy":"arepo_topic","embeddable":true,"href":"https:\/\/arepoconsult.com\/en\/wp-json\/wp\/v2\/arepo_topic?post=7663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}